The house is a standard two storey detached in the midlands.
Dry verge end caps installation.
With a very simple installation process the verge is supplied in packs of 10 units containing everything required for a neat and secure fixing including batten end clips and stainless steel nails.
Fitting dry verge to old roof.
If you are fitting your dry verge to an existing building you need to remove all of the old underclock and motor bedding before fixing.
Dry verge systems should be quick and easy to install and if fitted correctly they can provide exceptional security and weather resistance.
Trim the end cap to fit between the last 2 verge pieces if necessary.
The verge is probably the most vulnerable part of the roof due to its exposure to wind and water penetration.
If the end cap doesn t fit well over the ridge between the last 2 verge pieces use a utility knife to trim the edges of it.
Finish the dry verge system with an end cap or block end using screws provided or the method shown in the manufacturer s guide.
The verge pointing on my roof needs sorting.
Looking at neighbouring houses it s going to need 52 caps to do both sides.
However there has been growing concern that some dry verge systems aren t being fixed securely and following numerous instances of product failure the nhbc has issued new technical guidance to reduce.
Dry verge caps installation cp tile protection.
Finish the ridge with either a ridge end cap or a block end ridge.
Take care to ensure this is done correctly and that they interlock properly at the apex.
Marley dry verge systems have been designed and tested to meet bs 8612 and prevent common issues such as gable end staining and eaves closure units coming loose.
The end cap piece must nestle between the verge pieces to create a good seal.
How much does dry verge cost.
Can anyone who has had dry verge caps installed recently let me know how much it cost.
Using dry verge caps and units gives a strong and reliable fix without mortar.
For refurbishment of an existing roof it can be hard to decide between repointing mortar or for using plastic dry verge caps.
Cut the material on the underside of the end cap.